Questions/Comments

Fill out the information below and we'll connect you with the right person. (* = Required Fields)

Offices
San Francisco
160 S. Van Ness Ave.
San Francisco, CA 94103
Office Details
Silicon Valley
1210 Coleman Avenue
Santa Clara, CA 95050
Office Details
East Bay
2121 N California Blvd, Suite 301
Walnut Creek, CA 94596
Office Details
Southern California
1324 Abbot Kinney Blvd.
Venice, CA 90291
Office Details
Seattle
2013 4th Ave., Suite 400
Seattle, WA 98101
Office Details
Montana
218 South 2nd Street
Livingston, MT 59047
Office Details
Project Highlights

First Light pouring last levels of concrete, now leasing the offices below 459 condos

Build Group is in the final stages of vertical construction at the First Light condominium tower.

High above the roaring buses of Third Avenue, Build Group is in the final stages of vertical construction at the First Light condominium tower. The steel framing has topped out at 2000 Third Ave., where Westbank is developing the 48-story project. City inspection reports say concrete was being poured at level 47 on Wednesday. The crane and concrete pump are still visible from the sidewalk, but won’t be needed much longer.

Date

September 1, 2023

Type

Project Highlights